Chambord, 1519 : le début du chantier, nouveaux documents (notice n° 277723)

détails MARC
000 -LEADER
fixed length control field 02500cam a2200181 4500500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250117194819.0
041 ## - LANGUAGE CODE
Language code of text/sound track or separate title fre
042 ## - AUTHENTICATION CODE
Authentication code dc
100 10 - MAIN ENTRY--PERSONAL NAME
Personal name Fourrier, Thibaud
Relator term author
245 00 - TITLE STATEMENT
Title Chambord, 1519 : le début du chantier, nouveaux documents
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2024.<br/>
500 ## - GENERAL NOTE
General note 95
520 ## - SUMMARY, ETC.
Summary, etc. Aujourd’hui, seuls trois documents, datés des 6 et 7 septembre 1519, nous permettent de situer le début du chantier de Chambord, le plus grand du règne de François Ier. De nouvelles sources, jusqu’à présent inexploitées, nous permettent de suivre au plus près, à travers les déplacements quotidiens du roi, le processus de lancement des travaux au cours de l’année 1519, jusqu’à la cérémonie officialisant l’ouverture du chantier et la pose de la première pierre. Depuis son arrivée sur les lieux, le roi multipliait les visites de chantier, tout en menant en parallèle les affaires du royaume, dominées par les suites de l’élection impériale, les négociations de paix et le projet de croisade initiés par le pape. Cette nouvelle chronologie met en évidence l’importance du chantier et l’implication personnelle du souverain, toujours avec l’appui de sa femme et de sa mère, dans ce grand dessein architectural.
520 ## - SUMMARY, ETC.
Summary, etc. ‪As of today, only three documents (dated from September 6th and 7th, 1519) allow us to situate the start of Chambord’s construction, the greatest in the reign of Francis I. New historical sources, hitherto untapped, enable us to follow as closely as possible, via the daily movements of the king, the process of launching the works throughout 1519, up until the ceremony finalizing the opening of the construction site and the laying of the first stone. From his arrival on the scene, the king increased work site inspections while simultaneously leading the kingdom's affairs, which were dominated by the aftermath of the imperial election, the peace negotiations, and the crusade project initiated by the pope. This new chronology places in plain view the construction’s significance and the personal involvement of the sovereign, always with the support of his wife and his mother, in this great architectural scheme.‪
700 10 - ADDED ENTRY--PERSONAL NAME
Personal name Parot, François
Relator term author
786 0# - DATA SOURCE ENTRY
Note Annales de Bretagne et des pays de l’Ouest | 131-1 | 1 | 2024-03-18 | p. 121-147 | 0399-0826
856 41 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="https://shs.cairn.info/revue-annales-de-bretagne-et-des-pays-de-l-ouest-2024-1-page-121?lang=fr&redirect-ssocas=7080">https://shs.cairn.info/revue-annales-de-bretagne-et-des-pays-de-l-ouest-2024-1-page-121?lang=fr&redirect-ssocas=7080</a>

Pas d'exemplaire disponible.

PLUDOC

PLUDOC est la plateforme unique et centralisée de gestion des bibliothèques physiques et numériques de Guinée administré par le CEDUST. Elle est la plus grande base de données de ressources documentaires pour les Étudiants, Enseignants chercheurs et Chercheurs de Guinée.

Adresse

627 919 101/664 919 101

25 boulevard du commerce
Kaloum, Conakry, Guinée

Réseaux sociaux

Powered by Netsen Group @ 2025