Local Resistance to Wind Energy Projects in Languedoc-Roussillon

Par : Contributeur(s) : Type de matériel : TexteTexteLangue : français Détails de publication : 2003. Ressources en ligne : Abrégé : Wind energy seems to be the only option for France to comply to the European directive on renewable energies’ promotion (which seeks to shift the renewable energy-based electricity production’s share from 15 % to 21 %). At the beginning of 2000, the Jospin government decided to change from an invitation to tender (2005 Eole Program) to a policy based on guaranteed buyback prices of the energy produced. The buyback price was fixed at a very rewarding level. Numerous companies thus began to prospect intensively the French territory in search of favourable sites. Not surprisingly, it induced local controversies. This paper is based on a case study in Languedoc-Roussillon undertaken during of the first semester of 2002, and highlights an interesting “moment” when the “new forms of deliberation” or of planning appeared to be forgotten and replaced by a pure market-like rationality in the context of the electricity market’s deregulation. Those economic tools are powerful but their confrontation with territorial logics, by taking no account of the territories’ projects, generates “unacceptability.” Above all they induce the hostility of local actors who denounce the opacity and the “anarchy” of the system. In order to overcome the crisis, land-planning is rediscovered as a necessity. However this does not result on a return back to square one, but in a policy mix combining competition, decentralization and “incentive” planning. Will this be sufficient to limit the “collateral damages” of the guaranteed prices’ system?
Tags de cette bibliothèque : Pas de tags pour ce titre. Connectez-vous pour ajouter des tags.
Evaluations
    Classement moyen : 0.0 (0 votes)
Nous n'avons pas d'exemplaire de ce document

7

Wind energy seems to be the only option for France to comply to the European directive on renewable energies’ promotion (which seeks to shift the renewable energy-based electricity production’s share from 15 % to 21 %). At the beginning of 2000, the Jospin government decided to change from an invitation to tender (2005 Eole Program) to a policy based on guaranteed buyback prices of the energy produced. The buyback price was fixed at a very rewarding level. Numerous companies thus began to prospect intensively the French territory in search of favourable sites. Not surprisingly, it induced local controversies. This paper is based on a case study in Languedoc-Roussillon undertaken during of the first semester of 2002, and highlights an interesting “moment” when the “new forms of deliberation” or of planning appeared to be forgotten and replaced by a pure market-like rationality in the context of the electricity market’s deregulation. Those economic tools are powerful but their confrontation with territorial logics, by taking no account of the territories’ projects, generates “unacceptability.” Above all they induce the hostility of local actors who denounce the opacity and the “anarchy” of the system. In order to overcome the crisis, land-planning is rediscovered as a necessity. However this does not result on a return back to square one, but in a policy mix combining competition, decentralization and “incentive” planning. Will this be sufficient to limit the “collateral damages” of the guaranteed prices’ system?

PLUDOC

PLUDOC est la plateforme unique et centralisée de gestion des bibliothèques physiques et numériques de Guinée administré par le CEDUST. Elle est la plus grande base de données de ressources documentaires pour les Étudiants, Enseignants chercheurs et Chercheurs de Guinée.

Adresse

627 919 101/664 919 101

25 boulevard du commerce
Kaloum, Conakry, Guinée

Réseaux sociaux

Powered by Netsen Group @ 2025